WP023: The Haztimator: Knowledge-Based Time and Cost Estimating of Hazardous Waste Remediation Projects
Abstract/Contents
- Abstract
This paper presents a new approach to conceptual cost estimating that will enable better cost control starting from the early stages of the design process. Our approach is based on the use of model-based reasoning tools to generate plausible alternative designs automatically at conceptual and preliminary stages of the design, with the limited amount of data available at those stages. We believe that these plausible detailed designs can be accurately estimated and then refined during later stages of design serving as "defending champions" against which every succeeding detailed design - or "challenger" may be compared. Further, the costs associated with these designs can be stored with semantic links to the design components in the design model, and can be refined as the design evolves. We claim that such an approach will have substantial impacts on the way that civil engineers can estimate future projects and control their costs.
This paper introduces a model-based design and cost estimating system, "Haztimator", which was implemented to apply this approach to the hazardous waste engineering domain. We will first describe the problems associated with the traditional approach to conceptual cost estimating focusing on the unique challenges of the Hazardous Waste domain. A section on Haztimator and its implementation environment will follow this introduction. Then, we will describe the potential implications of our approach on the design and project management process, and will provide some predictions about the impacts of design automation on the organizational structure of civil engineering firms. The final section of the paper will discuss possible future extensions to our proof-of-concept prototype.
Description
Type of resource | text |
---|---|
Date created | November 1993 |
Creators/Contributors
Author | Oralkan, Gaye A. | |
---|---|---|
Author | Staudinger, Jeff | |
Author | Levitt, Raymond E. | |
Author | Roberts, Paul |
Subjects
Subject | CIFE |
---|---|
Subject | Center for Integrated Facility Engineering |
Subject | Stanford University |
Subject | Cost Estimation |
Subject | Model-Based Design |
Genre | Technical report |
Bibliographic information
Access conditions
- Use and reproduction
- User agrees that, where applicable, content will not be used to identify or to otherwise infringe the privacy or confidentiality rights of individuals. Content distributed via the Stanford Digital Repository may be subject to additional license and use restrictions applied by the depositor.
Preferred citation
- Preferred Citation
- Oralkan, Gaye A. and Staudinger, Jeff and Levitt, Raymond E. and Roberts, Paul. (1993). WP023: The Haztimator: Knowledge-Based Time and Cost Estimating of Hazardous Waste Remediation Projects. Stanford Digital Repository. Available at: http://purl.stanford.edu/kb243wy1828
Collection
CIFE Publications
View other items in this collection in SearchWorksContact information
- Contact
- cife-email@stanford.edu
Also listed in
Loading usage metrics...