Abstract
Since 1996, multi-disciplinary space mission design teams at NASA\'s Jet Propulsion Laboratory have been using a novel concurrent design approach. This approach creates integrated early phase designs that used to take nine months in about three weeks! To make this possible, the JPL group known as Team-X completes most of its engineering and collaboration work in just nine hours of intensive, technically mediated and socially facilitated group sessions. Since 2004, we have used the JPL methods successfully in teaching Virtual Design and Construction methods for Civil Engineering project design. We call the enabling technically mediated social collaboration process Integrated Concurrent Engineering (ICE). Previous research has observed that ICE uses atypical organization, process, and technology, but has not explained why JPL consistently achieves radical schedule compression while others consistently fail. Our analysis suggests the speed of most engineering processes is limited by their response latency, the lag time from a participant asking a question to receiving an answer that is good enough to enable further work. We find that typical response latencies ranging from days to weeks cause routine conceptual design projects to stretch out for months or years. In contrast, reliable, exceptionally short response latencies in the range of a few minutes can enable the extremely short durations for space mission designs at JPL and for facility design teams using our ICE method. Based on our analysis of the JPL process and our own teaching and user experiences, this paper offers thirteen factors that, when all functioning at a high level, enable extremely short response latency of ICE team participants, short design session duration, and high perceived design quality. We view ICE as a Just in Time approach to knowledge work, in that it manufactures interdependent design decisions with short latency (lead time) and high reliability (service level). This paper proposes that project managers should establish the specific, measurable objective of very short response latency as both a unifying goal for project teams and a practical metric to describe, evaluate, and manage engineering design collaboration. We propose response latency as a fundamental theoretical factor that (along with task duration, coordination, and rework) determines project duration.

Description

Type of resource text
Date created April 2009

Creators/Contributors

Author Chachere, John
Author Kunz, John
Author Levitt, Raymond

Subjects

Subject CIFE
Subject Center for Integrated Facility Engineering
Subject Stanford University
Subject Coordination
Subject Design
Subject Extreme Collaboration
Subject ICE
Subject Integrated Concurrent Engineering
Subject Organization Models
Subject Process Models
Subject VDC
Subject Virtual Design and Construction
Genre Technical report

Bibliographic information

Access conditions

Use and reproduction
User agrees that, where applicable, content will not be used to identify or to otherwise infringe the privacy or confidentiality rights of individuals. Content distributed via the Stanford Digital Repository may be subject to additional license and use restrictions applied by the depositor.

Preferred citation

Preferred Citation
Chachere, John and Kunz, John and Levitt, Raymond. (2009). WP116: The Role of Reduced Latency in Integrated Concurrent Engineering. Stanford Digital Repository. Available at: http://purl.stanford.edu/bd089dx8723